Water infrastructure investing means taking exposure to the pipes, treatment plants, storage and wastewater systems that move and clean water. Data-center cooling matters to those investors because data centers consume water directly for cooling and indirectly through electricity generation. Demand from aging systems and fast data-center growth puts water supply, costs and permits in focus. Investors can use public need estimates and efficiency metrics to judge risk and opportunity.
Table of Contents
- How big is the funding need?
- How much water do data centers use?
- What controls cooling-water use?
- What should investors check?
How big is the funding need?
The U.S. Environmental Protection Agency puts drinking-water needs at $625 billion over 20 years for pipes, treatment, storage and lead-service-line work, according to the EPA survey page. Its separate wastewater survey puts wastewater, stormwater and septic needs at about $630 billion over 20 years. The American Society of Civil Engineers gave drinking water C-, wastewater D+ and stormwater D in its 2025 Report Card.
It also projected a $3.7 trillion total U.S. infrastructure investment gap for 2024-2033. For investors, federal financing shapes project flow. The U.S. Environmental Protection Agency made $7.5 billion in low-interest financing available for drinking-water, wastewater and stormwater projects.
How much water do data centers use?
Lawrence Berkeley National Laboratory estimated direct on-site data-center water consumption at 66 billion liters in 2023, up from 21.2 billion liters in 2014, as described in the Lawrence Berkeley National Laboratory report. That direct use covers cooling and other on-site needs. The same laboratory analysis found much larger indirect use.
It estimated roughly 800 billion liters consumed at power plants generating data-center electricity in 2023, about 12 times direct use. Company results show the same pressure. Google reported company-wide water consumption of 10.9 billion gallons in 2025, up 34% year over year, driven largely by data-center cooling.
What controls cooling-water use?
The U.S. Department of Energy defines water usage effectiveness as annual site liters divided by IT-equipment kilowatt-hours, according to DOE efficiency guidance. Lower values mean less water per unit of computing work.
The same guidance lists low-cost ways to cut cooling-water use at federal data centers. Measures work by moving heat with less water and running towers more efficiently. Savings vary by climate, load and system design. Investors should compare sites on the same metric, not on total gallons alone.
- Improve airflow management and containment
- Raise chilled-water temperatures where safe
- Use economizers for free cooling
- Optimize cooling-tower chemistry and cycles
What should investors check?
Start with water risk around a data-center plan. Local supply limits, permit terms and utility costs can affect timelines and operating expense. National need totals do not translate directly into revenue for any one firm. Then check efficiency and funding signals.
Falling liters per IT kilowatt-hour can ease exposure to drought, price and community opposition. Public project pipelines and low-interest water financing can support demand for pipes, pumps, meters, treatment equipment and services. Use a short screen before buying exposure to either theme. Ask how a facility will cut liters per IT kilowatt-hour before assuming growth is low-risk.
- Review water-use trends and cooling methods
- Ask how growth plans change peak water demand
- Track local utility and permit constraints
- Follow funded project backlogs, not need estimates alone